Info |
---|
Please note that the process outlined on this page may vary based on individual customer configurations and circumstances (i.e., pairing loggers to shipments might also be done via API integration). |
Download printable one-pager:
English
View file | ||
---|---|---|
|
Arabic
View file | ||
---|---|---|
|
Simplified Chinese
View file | ||
---|---|---|
|
Spanish
View file | ||
---|---|---|
|
French
View file | ||
---|---|---|
|
Russian
View file | ||
---|---|---|
|
Follow these steps when adding a Saga device to a shipment:
1️⃣ Check the
Status | ||
---|---|---|
|
If the battery level is
(or adequately charged to complete a shipment as per agreements), go to step 2.Status colour Green title OVER 90% If the battery level is
(or not adequately charged to complete a shipment as per agreements), plug the device into a charging station (provided by Controlant)/USB charging adapter/computer USB port until it reaches the required battery level to function. To fully charge a device, you need to charge it for 6 hours and until the display shows 100% next to the battery with a flash icon.Status colour Red title UNDER 90%
2️⃣ Check the
Status | ||
---|---|---|
|
If the cloud connection is
, as indicated by aStatus colour Green title OK
, please proceed to step 3.Status title CLOUD ICON WITH A CHECKMARK If the connection
, as indicated by aStatus colour Red title FAILED
, try waking up the device by connecting it to a charging station provided by Controlant, a USB charging adapter, or a computer USB port, then disconnect and wait for 10 minutes to see if the device can connect to the cloud. If theStatus title CLOUD ICON WITH AN X
or theStatus title CLOUD ICON WITH AN X
continues to be displayed; please contact support@controlant.com, stating the location (country) and device ID number, and choose a different device.Status title SYNCING ICON
3️⃣ Check the
Status | ||
---|---|---|
|
A device that has not received shipment information shows the text
at theStatus title FREE
. If that is the case, proceed to step 4.Status title SHIPMENT STATUS If
shows in the top left corner of the display theStatus title SHIPPING
, and theStatus title SHIPMENT STATUS
blinks every 5 seconds, please contact support@controlant.com, stating the location (country) and device ID number.Status colour Yellow title SHIPment LED
4️⃣ Pair the device with the shipment on the Supply Chain Monitoring (SCM) platform
You need to access the SCM platform with your username and password. Pairing requires a specific role assigned to you by an Admin user. If you have any problems, please get in touch with support@controlant.com.
Alternatively, loggers may be paired to shipments via API integration.
5️⃣ Press the
Status | ||||
---|---|---|---|---|
|
Press and hold the
for 5–8 seconds to activate the device.Status colour Green title START BUTTON The
lights up when the device registers the button press as valid and remains on for 3 seconds. The lit-up led light means that you can release the button.Status colour Yellow title SHIPMENT LED With this step, you initiated the shipment. It is essential to consider the most appropriate Ignore period. This period allows the device to reach the most accurate temperature inside the packaging of goods.
According to the operational procedures, please ensure that the shipment is started with a considered Ignore period. This period can be set on the SCM platform to meet your needs.