1.3.3 Installation preparation and process
1 - Find a drawing of the facility or make one if you cant find it
2 - Mark on the drawing where measurement loggers should be placed
3 - Mark on the drawing where the gateways should be placed, following the guidelines
4 - Check for cellular connection where the gateways should be placed
5 - Check for electricity where the gateway should be placed
6 - Let a electrician install power sockets next to the gateway, if needed
7 - Fasten the gateway, following the guidelines
8 - Turn the gateway ON and check if it has connected to the Controlant data cloud
9 - Mark the gateway ID number on the facility drawing
10 - Distribute and fasten the measurement loggers, following the guidelines
11 - Mark on the facility drawing loggers ID numbers and location (shelf number etc.)
12 - Keep a log (Excel sheet) about all installed gateways/loggers with relevant information
Example of a warehouse drawing. Gateways and loggers has been market on the drawing
Example of a Installed Device log