- Get a drawing of the facility or make one if a drawing is not available
- Mark location of the loggers, following the guidelines
- Mark location of the gateways, following the guidelines
- Mark on the drawing where loggers shall be placed
- Mark on the drawing where the gateway should be placed
- Check cellular signal strength where the gateway shall be placed
- Let an electrician install power sockets where gateway will be placed (if needed)
- Install the gateway, following the guidelines, and turn it ON
- Mark the gateway ID number on the drawing
- Install the loggers, following the guidelines
- Mark the location of the loggers on the drawing with the ID number and the storage shelf location number