Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Include Page
FM Sunset
FM Sunset

1 - Find a drawing of the facility or make one if you cant find it

2 - Mark on the drawing where measurement loggers should be placed

3 - Mark on the drawing where the gateways should be placed, following the guidelines

4 - Check for cellular connection where the gateways should be placed

5 - Check for electricity where the gateway should be placed

6 - Let a electrician install power sockets next to the gateway, if needed

7 - Fasten the gateway, following the guidelines

8 - Turn the gateway ON and check if it has connected to the Controlant data cloud

9 - Mark the gateway ID number on the facility drawing

10 - Distribute and fasten the measurement loggers, following the guidelines

11 - Mark on the facility drawing the loggers ID number numbers and location description (shelf number etc.)

Image Removed12 - Keep a log (Excel sheet) about all installed gateways/loggers with relevant information




Example of a warehouse drawing. Gateways and loggers has been market on the drawing

Image Added

Example of a Installed Device log

View file
name

Cellular signal

FM Device list.xlsx

height250